✦ PRIVATE BETA · INVITE ONLY FOR TEXAS RAS

The all-in-one workspace built for Texas RAS.

Stop fighting broken Word documents, messy Excel sheets, and email attachments. SimpleRAS automates your project intake from TABS, tracks your statutory deadlines, generates professional inspection reports, and emails deliverables to clients in one click.

🔒 Currently Invite-Only ✉️ Email engineering@simpleras.com 🤝 White-Glove Onboarding 📱 Works on iPad, Mac & PC
Austin Medical Plaza · TABS #EABPRJ26019842
Active Project
1. Just Enter the TABS / EABPR Number
EABPRJ 26019842 ✓ Auto-Sync Active

SimpleRAS instantly pulls the official state records so you never retype project details.

2. Auto-Populated Project Details
Project Name: Austin Medical Plaza Phase II
Address: 4201 Medical Pkwy, Austin, TX
Building Owner: Lone Star Health Holdings LLC
Architect of Record: Studio 8 Architects (Jane Doe, AIA)
Estimated Cost: $4,250,000
Square Footage: 48,500 sq ft
30-Day Plan Review Clock 16 TAC §68.50
18 Days Remaining

Mandatory 30-day statutory turnaround from receipt of plans.

1-Year Inspection Window 16 TAC §68.52
28 Days Remaining

Inspection must be completed within 1 year of construction completion.

90-Day Owner Correction Clock 16 TAC §68.52(c)
12 Days Left (Urgent)

Statutory window for owner to resolve inspection violations.

TEXAS ACCESSIBILITY STANDARDS (TAS) INSPECTION REPORT
Austin Medical Plaza · TDLR Project #EABPRJ26019842
TAS §404.2.4.1 Violation (Punch List)
Main Entry Vestibule Doors: Pull-side maneuvering clearance is 56 inches (60 inches required). Door closer speed exceeds 5-second maximum sweep.
TAS §604.2 Compliant
1st Floor Public Restroom: Water closet centerline measured at 17.5 inches from side wall (16-18 inches permitted).
Professional Deliverables in 1 Click
  • ✓ Clean, publication-quality formatting
  • ✓ Automatic 2012 TAS section citations
  • ✓ Embedded job site photos & measurements
  • ✓ No broken Word tables or formatting headaches
Seq # Statutory Event Date & Time Delivery Recipient Status
Seq 1.0 Project Registration Received Aug 12, 2026 TABS Portal ✓ Logged
Seq 2.1 Notice of Plan Review Findings Issued Aug 18, 2026 Owner & Architect ✓ Emailed
Seq 5.1 Inspection Report & 90-Day Notice Aug 22, 2026 Owner & GC ✓ Delivered
How It Makes Your Life Easier

The Old Way vs. The SimpleRAS Way

See why Texas accessibility specialists are switching from Word, Excel, and Adobe Acrobat.

The Old Way (Administrative Nightmare)
  • Manual Data Entry: Retyping addresses, owner names, and architect contacts into 4 different Word and Excel files.
  • Spreadsheet Deadlines: Manually counting 30-day review clocks and 1-year inspection deadlines in Excel or on a wall calendar.
  • Word Table Headaches: Fighting broken table formatting, misaligned photos, and font glitches at 11 PM on Sunday.
  • Email Juggling: Exporting PDFs -> drafting cover letters -> attaching files -> emailing owners -> manually logging in a separate spreadsheet.
  • TDLR Audit Panic: Scrambling for days to rebuild your Record of Transactions (ROT) history when the state audits your files.
The SimpleRAS Way (Effortless & Automated)
  • Instant TABS Pull: Enter the EABPRJ number and your entire project workspace is ready in 2 seconds.
  • Automated Deadlines: Big, color-coded countdown gauges for your 30-day plan review, 1-year inspection, and 90-day correction clocks.
  • 1-Click Professional Reports: Clean, publication-grade inspection reports with photos and TAS citations created automatically.
  • In-App Client Emailing: 1 click sends the cover letter and report directly to the owner and architect with a copy in your personal inbox.
  • 100% Audit-Proof: Your official TDLR Record of Transactions (ROT) log is generated automatically with all statutory sequence numbers.
Core Features

Everything you need to run your RAS practice.

No bloated features. No confusing setup. Just the exact tools Texas specialists need every day.

1. Instant TABS / EABPR Sync

Type in any TDLR project number. SimpleRAS instantly imports the project name, address, owner contact, architect info, square footage, and valuation.

⏱️

2. Deadlines You Can't Miss

Visual countdowns for the 30-day plan review turnaround (16 TAC §68.50), 1-year inspection window (§68.52), and 90-day owner correction clock (§68.52(c)).

📋

3. 1-Click Professional Reports

Generate beautiful, architectural-grade inspection punch lists and plan review reports complete with embedded 2012 TAS citations and photo markups.

✉️

4. In-App Client Transmittals

Email deliverables directly to building owners and architects from inside the app. Cover letter on Page 1, technical report on Pages 2+, with automated copies in your inbox.

🛡️

5. 1-Click TDLR Audit Log (ROT)

Every action automatically logs to your official Record of Transactions under 16 TAC §68.76 (Seq 1.0–7.1). Export the official state PDF with one click.

📱

6. Works on Any Device

Use SimpleRAS on your iPad in the field, your Mac or PC in the office, or your phone on the go. Everything stays in sync in real time.

ROI Calculator

See how much time and money you save.

How many projects does your firm handle in a typical month?

Monthly Projects: 25 Projects / mo
5 25 50 80+
35 Hours
Admin Time Saved / Month
No manual Word tables, Excel tracking, or PDF stitching
$5,250
Billable Time Reclaimed / Month
Based on standard $150/hr specialist billing rate
$50 / mo
Your Total Investment
Pays for itself in less than 20 minutes of work
Simple Pricing

One simple plan. Everything included.

No hidden fees, no per-project charges, and no long-term contracts. Cancel anytime.

Monthly Annual Save 2 Months
FAQ

Frequently Asked Questions

Will TDLR accept the reports and forms generated by SimpleRAS?

Yes, 100%. All forms (AB042, AB043, Form 005, EAB247N) are exact vector mappings of official TDLR state forms. Our Record of Transactions (ROT) logs use official state sequence codes (Seq 1.0–7.1) designed strictly under 16 TAC Chapter 68.

Do I need to install any software on my computer or iPad?

No. SimpleRAS is 100% cloud-based. You can log in from any web browser on your iPad in the field, your Mac or PC at your desk, or your phone on the road.

How does the 1-click client emailing work?

When you finish a plan review or inspection, click "Send Transmittal". SimpleRAS packages your official cover letter on Page 1 and your technical report on Pages 2+, addresses it directly to the owner and architect, and sends it. A copy is automatically placed in your inbox for your records.

How does pricing work if I have employees or subcontractors?

Your primary firm account is $50/month. You can add additional inspectors or administrative team members for just $10/month per person. All team members share the same searchable project database.

How do I get an invite to SimpleRAS?

SimpleRAS is currently invite-only to ensure dedicated onboarding for Texas firms. Send an email to engineering@simpleras.com with your firm name and TDLR RAS license number, and our team will get your workspace activated.

Is my project data backed up and secure?

Yes. SimpleRAS is hosted on Google Cloud infrastructure with encrypted storage, multi-region redundancy, and automated daily backups so you never lose a project record.

SimpleRAS is currently invite-only.

We are onboarding Texas accessibility firms on a rolling basis. Email our engineering team with your firm name and TDLR RAS number to request an invite.

Email engineering@simpleras.com
Direct founder & engineering team onboarding